    • 1. Sampling method of determining standard time is profitable for long cycle operation.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 2. The unit cost in case of batch production is __________ as compared to jobbing production.

    • Options
    • A. same
    • B. low
    • C. high
    • Discuss
    • 3. The essential condition for the decompression of an activity is that

    • Options
    • A. the project time should change due to decompression
    • B. after decompression the time of an activity invariably exceeds its normal time
    • C. an activity could be decompressed to the maximum extent of its normal time
    • D. none of the above
    • Discuss
    • 4. When slack of an activity is positive

    • Options
    • A. it represents a situation where extra resources are available and the completion of project is not delayed
    • B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time
    • C. the activity is critical and any delay in its performance will delay the completion of whole project
    • D. any one of the above
    • Discuss
    • 5. In value engineering, important consideration is given to

    • Options
    • A. customer satisfaction
    • B. function concept
    • C. profit maximisation
    • D. cost reduction
    • Discuss
    • 6. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be

    • Options
    • A. 300
    • B. 460
    • C. 500
    • D. 1000
    • Discuss
    • 7. Which of the following statement is wrong?

    • Options
    • A. An activity consume time and resources whereas an event do not consume time or resources.
    • B. The performance of a specific task is called an activity.
    • C. An event is an instantaneous point in time at which an activity begins or ends.
    • D. The turning of a job on lathe is an event whereas job turned is an activity.
    • Discuss
    • 8. M.T.M. is used to

    • Options
    • A. improve existing methods
    • B. establish time standards
    • C. develop effective methods in advance of the beginning of production
    • D. all of the above
    • Discuss
    • 9. The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of

    • Options
    • A. product layout
    • B. process layout
    • C. fixed position layout
    • D. a combination of line and process layout
    • Discuss
    • 10. Acceptance sampling is used in

    • Options
    • A. job production
    • B. batch production
    • C. mass production
    • D. all of these
    • Discuss