CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
Break even analysis is a
Options
A. short term analysis
B. long term analysis
C. average of short and long term analysis
D. any one of these
Correct Answer
short term analysis
Industrial Engineering and Production Management problems
Search Results
1. Sampling method of determining standard time is profitable for long cycle operation.
Options
A. Correct
B. Incorrect
Show Answer
Scratch Pad
Discuss
Correct Answer: Correct
2. The unit cost in case of batch production is __________ as compared to jobbing production.
Options
A. same
B. low
C. high
Show Answer
Scratch Pad
Discuss
Correct Answer: low
3. The essential condition for the decompression of an activity is that
Options
A. the project time should change due to decompression
B. after decompression the time of an activity invariably exceeds its normal time
C. an activity could be decompressed to the maximum extent of its normal time
D. none of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: an activity could be decompressed to the maximum extent of its normal time
4. When slack of an activity is positive
Options
A. it represents a situation where extra resources are available and the completion of project is not delayed
B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time
C. the activity is critical and any delay in its performance will delay the completion of whole project
D. any one of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: it represents a situation where extra resources are available and the completion of project is not delayed
5. In value engineering, important consideration is given to
Options
A. customer satisfaction
B. function concept
C. profit maximisation
D. cost reduction
Show Answer
Scratch Pad
Discuss
Correct Answer: cost reduction
6. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be
Options
A. 300
B. 460
C. 500
D. 1000
Show Answer
Scratch Pad
Discuss
Correct Answer: 500
7. Which of the following statement is wrong?
Options
A. An activity consume time and resources whereas an event do not consume time or resources.
B. The performance of a specific task is called an activity.
C. An event is an instantaneous point in time at which an activity begins or ends.
D. The turning of a job on lathe is an event whereas job turned is an activity.
Show Answer
Scratch Pad
Discuss
Correct Answer: The turning of a job on lathe is an event whereas job turned is an activity.
8. M.T.M. is used to
Options
A. improve existing methods
B. establish time standards
C. develop effective methods in advance of the beginning of production
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
9. The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
Options
A. product layout
B. process layout
C. fixed position layout
D. a combination of line and process layout
Show Answer
Scratch Pad
Discuss
Correct Answer: product layout
10. Acceptance sampling is used in
Options
A. job production
B. batch production
C. mass production
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: mass production
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology