logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • The essential condition for the decompression of an activity is that


  • Options
  • A. the project time should change due to decompression
  • B. after decompression the time of an activity invariably exceeds its normal time
  • C. an activity could be decompressed to the maximum extent of its normal time
  • D. none of the above

  • Correct Answer
  • an activity could be decompressed to the maximum extent of its normal time 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. When slack of an activity is positive

    • Options
    • A. it represents a situation where extra resources are available and the completion of project is not delayed
    • B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time
    • C. the activity is critical and any delay in its performance will delay the completion of whole project
    • D. any one of the above
    • Discuss
    • 2. In value engineering, important consideration is given to

    • Options
    • A. customer satisfaction
    • B. function concept
    • C. profit maximisation
    • D. cost reduction
    • Discuss
    • 3. In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a

    • Options
    • A. belt conveyor
    • B. bucket conveyor
    • C. fork lift truck
    • D. overhead crane
    • Discuss
    • 4. A dummy activity in a net work diagram

    • Options
    • A. is represented by a dotted line
    • B. is an artificial activity
    • C. does not consume time or resources
    • D. all of these
    • Discuss
    • 5. A critical activity has

    • Options
    • A. maximum slack
    • B. minimum slack
    • C. zero slack
    • D. average slack
    • Discuss
    • 6. The unit cost in case of batch production is __________ as compared to jobbing production.

    • Options
    • A. same
    • B. low
    • C. high
    • Discuss
    • 7. Sampling method of determining standard time is profitable for long cycle operation.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 8. Break even analysis is a

    • Options
    • A. short term analysis
    • B. long term analysis
    • C. average of short and long term analysis
    • D. any one of these
    • Discuss
    • 9. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be

    • Options
    • A. 300
    • B. 460
    • C. 500
    • D. 1000
    • Discuss
    • 10. Which of the following statement is wrong?

    • Options
    • A. An activity consume time and resources whereas an event do not consume time or resources.
    • B. The performance of a specific task is called an activity.
    • C. An event is an instantaneous point in time at which an activity begins or ends.
    • D. The turning of a job on lathe is an event whereas job turned is an activity.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment