logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • A dummy activity in a net work diagram


  • Options
  • A. is represented by a dotted line
  • B. is an artificial activity
  • C. does not consume time or resources
  • D. all of these

  • Correct Answer
  • all of these 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. A critical activity has

    • Options
    • A. maximum slack
    • B. minimum slack
    • C. zero slack
    • D. average slack
    • Discuss
    • 2. If F is the fixed cost, V is the variable cost per unit (or total variable costs) and P is the selling price of each unit (or total sales value), then break even point is equal to

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 3. The increase in depth of cut and feed rate __________ surface finish.

    • Options
    • A. improves
    • B. deteriorates
    • C. does not effect
    • Discuss
    • 4. The infeed grinding is used to

    • Options
    • A. produce tapers
    • B. grind shoulders and formed surfaces
    • C. grind long, slender shafts or bars
    • D. ail of these
    • Discuss
    • 5. A diamond locating pin is used in jigs and fixtures because

    • Options
    • A. diamond is very hard and wear resistant
    • B. it occupies very little space
    • C. it helps in assembly with tolerance on centre distance
    • D. it has a long life
    • Discuss
    • 6. In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a

    • Options
    • A. belt conveyor
    • B. bucket conveyor
    • C. fork lift truck
    • D. overhead crane
    • Discuss
    • 7. In value engineering, important consideration is given to

    • Options
    • A. customer satisfaction
    • B. function concept
    • C. profit maximisation
    • D. cost reduction
    • Discuss
    • 8. When slack of an activity is positive

    • Options
    • A. it represents a situation where extra resources are available and the completion of project is not delayed
    • B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time
    • C. the activity is critical and any delay in its performance will delay the completion of whole project
    • D. any one of the above
    • Discuss
    • 9. The essential condition for the decompression of an activity is that

    • Options
    • A. the project time should change due to decompression
    • B. after decompression the time of an activity invariably exceeds its normal time
    • C. an activity could be decompressed to the maximum extent of its normal time
    • D. none of the above
    • Discuss
    • 10. The unit cost in case of batch production is __________ as compared to jobbing production.

    • Options
    • A. same
    • B. low
    • C. high
    • Discuss


    Comments

    There are no comments.

Enter a new Comment