  • The rate of removing metal is __________ by increasing the depth of cut.


  • Options
  • A. decreased
  • B. increased

  • Correct Answer
  • increased 


  • Production Engineering problems


    Search Results


    • 1. The angle between the lathe centres is

    • Options
    • A. 30°
    • B. 45°
    • C. 60°
    • D. 90°
    • Discuss
    • 2. The vector sum of cutting velocity and chip velocity is __________ shear velocity.

    • Options
    • A. equal to
    • B. less than
    • C. more than
    • Discuss
    • 3. In drilling bakellite and fibrous plastics, the point angle of a drill is

    • Options
    • A. 90°
    • B. 118°
    • C. 135°
    • D. 150°
    • Discuss
    • 4. The shear velocity is the velocity of

    • Options
    • A. tool relative to the workpiece
    • B. chip relative to the tool
    • C. tool along the tool face
    • D. none of these
    • Discuss
    • 5. For turning small taper on long workpiece, the suitable method is

    • Options
    • A. by a form tool
    • B. by setting over the tail stock
    • C. by a taper turning attachment
    • D. by swivelling the compound rest
    • Discuss
    • 6. A grinding wheel is said to be of __________ if the abrasive grains can be easily dislodged.

    • Options
    • A. soft grade
    • B. medium grade
    • C. hard grade
    • Discuss
    • 7. In a shaper, the metal is removed during

    • Options
    • A. forward stroke
    • B. return stroke
    • C. both the forward and return strokes
    • D. neither the forward nor the return stroke
    • Discuss
    • 8. Which of the following statement is correct about EDM machining?

    • Options
    • A. It can machine hardest materials.
    • B. It produces high degree of surface finish.
    • C. The tool and work are never in contact with each other.
    • D. all of these
    • Discuss
    • 9. The time (in minutes) for a drilling a hole is given by

      where h is the

    • Options
    • A. length of the drill
    • B. drill diameter
    • C. flute length of the drill
    • D. cone height of the drill
    • Discuss
    • 10. In __________ operation, the cutting force is maximum when the tooth begins its cut and reduces it to minimum when the tooth leaves the work.

    • Options
    • A. up milling
    • B. down milling
    • C. face milling
    • D. end milling
    • Discuss