In velocity compounding of an impulse turbine, the expansion of steam takes place in a nozzle or a set of nozzles from the boiler pressure to condenser pressure.
Options
A. True
B. False
Correct Answer
True
More questions
1. Production cost refers to prime cost plus
Options
A. factory overheads
B. factory and administration overheads
C. factory, administration and sales overheads
D. factory, administration, sales overheads and profit
5. An electric cable of aluminium conductor (k = 240 W/mK) is to be insulated with rubber (k = 0.15 W/mK). The cable is to be located in air (h = 6 W/m2). The critical thickness of insulation will be