  • Question
  • The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)


  • Options
  • A. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most
  • B. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most
  • C. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most
  • D. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most

  • Correct Answer
  •  


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. A-B-C analysis is used in

    • Options
    • A. CPM
    • B. PERT
    • C. inventory control
    • D. all of these
    • Discuss
    • 2. In break even analysis, total cost consists of

    • Options
    • A. fixed cost + sales revenue
    • B. variable cost + sales revenue
    • C. fixed cost + variable cost
    • D. fixed cost + variable cost + profit
    • Discuss
    • 3. Gantt chart is used for

    • Options
    • A. inventory control
    • B. material handling
    • C. production schedule
    • D. machine repair schedules
    • Discuss
    • 4. Which of the following are the guidelines for the construction of a network diagram?

    • Options
    • A. Each activity is represented by one and only one arrow in the network.
    • B. Dangling must be avoided in a network diagram.
    • C. Dummy activity consumes no time or resource.
    • D. all of the above
    • Discuss
    • 5. String diagram is used

    • Options
    • A. for checking the relative values of various layouts
    • B. when a group of workers are working at a place
    • C. where processes require the operator to be moved from one work place to another
    • D. all of the above
    • Discuss
    • 6. PERT requires

    • Options
    • A. single time estimate
    • B. double time estimate
    • C. triple time estimate
    • D. none of these
    • Discuss
    • 7. Linear programming model can be applied to line balancing problem and transportation problem.

    • Options
    • A. True
    • B. False
    • Discuss
    • 8. When slack of an activity is negative

    • Options
    • A. it represents a situation where extra resources are available and the completion of project is not delayed
    • B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time
    • C. the activity is critical and any delay in its performance will delay the completion of whole project
    • D. all of the above
    • Discuss
    • 9. The limit of eccentricity is based upon no tension condition.

    • Options
    • A. True
    • B. False
    • Discuss
    • 10. A load which is spread over a beam in such a manner that it varies uniformly over the whole length of abeam is called uniformly __________ load.

    • Options
    • A. distributed
    • B. varying
    • Discuss