logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • The routing function in a production system design is concerned with


  • Options
  • A. manpower utilisation
  • B. quality assurance of the product
  • C. machine utilisation
  • D. optimising material flow through the plant

  • Correct Answer
  • machine utilisation 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In inventory control theory, the economic order quantity is

    • Options
    • A. average level of inventory
    • B. optimum lot size
    • C. capacity of a warehouse
    • D. lot size corresponding to break-even analysis
    • Discuss
    • 2. A systematic job improvement sequence will consist of

    • Options
    • A. motion study
    • B. time study
    • C. job enrichment
    • D. all of these
    • Discuss
    • 3. PERT analysis is based upon

    • Options
    • A. optimistic time
    • B. pessimistic time
    • C. most likely time
    • D. all of these
    • Discuss
    • 4. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?

    • Options
    • A. Halsey plan
    • B. Gantt plan
    • C. Rowan plan
    • D. Emerson's efficiency plan
    • Discuss
    • 5. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as

    • Options
    • A. job enlargement
    • B. job enrichment
    • C. job rotation
    • D. job evaluation
    • Discuss
    • 6. Job evaluation is the method of determining the

    • Options
    • A. relative values of a job
    • B. worker's performance on a job
    • C. worth of the machine
    • D. value of overall production
    • Discuss
    • 7. The aim of value engineering is to

    • Options
    • A. find the depreciation value of a machine
    • B. determine the selling price of a product
    • C. minimise the cost without change in quality of the product
    • D. all of the above
    • Discuss
    • 8. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 9. The main object of scientific layout is

    • Options
    • A. to produce better quality of product
    • B. to utilise maximum floor area
    • C. to minimise production delays
    • D. all of these
    • Discuss
    • 10. In CPM, the cost slope is determined by

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment