Which one of the following chart gives simultaneously information about the progress of work and machine loading?
Options
A. Process chart
B. Machine load chart
C. Man-machine chart
D. Gantt chart
Correct Answer
Man-machine chart
Industrial Engineering and Production Management problems
Search Results
1. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
6. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as
Job enrichment can be described as a medium through which management can motivate self-driven employees by assigning them additional responsibility normally reserved for higher level employees. By doing this, the employees feel like their work has meaning and is important to the company.
7. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?