  • Question
  • A diagram showing the path followed by men and materials while performing a task is known as


  • Options
  • A. string diagram
  • B. flow process chart
  • C. travel chart
  • D. flow diagram

  • Correct Answer
  • flow diagram 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In value engineering, the term value refers to

    • Options
    • A. manufacturing cost of the product
    • B. selling price of the product
    • C. total cost of the product
    • D. utility of the product
    • Discuss
    • 2. Military type of organisation is known as

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 3. A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called

    • Options
    • A. hoist
    • B. jib crane
    • C. portable elevator
    • D. chain conveyor
    • Discuss
    • 4. Probabilistic time for completion of any activity can be found out from

    • Options
    • A. optimistic time
    • B. pessimistic time
    • C. most likely time
    • D. all of these
    • Discuss
    • 5. Direct expenses include

    • Options
    • A. factory expenses
    • B. selling expenses
    • C. administrative expenses
    • D. none of these
    • Discuss
    • 6. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be

    • Options
    • A. TR
    • B.
    • C. TR + (S - T)R
    • D.
    • Discuss
    • 7. Which one of the following chart gives simultaneously information about the progress of work and machine loading?

    • Options
    • A. Process chart
    • B. Machine load chart
    • C. Man-machine chart
    • D. Gantt chart
    • Discuss
    • 8. The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as

    • Options
    • A. job enlargement
    • B. job enrichment
    • C. job rotation
    • D. job evaluation
    • Discuss
    • 9. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?

    • Options
    • A. Halsey plan
    • B. Gantt plan
    • C. Rowan plan
    • D. Emerson's efficiency plan
    • Discuss
    • 10. PERT analysis is based upon

    • Options
    • A. optimistic time
    • B. pessimistic time
    • C. most likely time
    • D. all of these
    • Discuss