  • Question
  • A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called


  • Options
  • A. hoist
  • B. jib crane
  • C. portable elevator
  • D. chain conveyor

  • Correct Answer
  • hoist 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Probabilistic time for completion of any activity can be found out from

    • Options
    • A. optimistic time
    • B. pessimistic time
    • C. most likely time
    • D. all of these
    • Discuss
    • 2. Direct expenses include

    • Options
    • A. factory expenses
    • B. selling expenses
    • C. administrative expenses
    • D. none of these
    • Discuss
    • 3. Line organisation is suitable for a big organisation.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 4. PERT is an event oriented technique.

    • Options
    • A. Correct
    • B. Incorrect
    • Discuss
    • 5. Fixed position layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss
    • 6. Military type of organisation is known as

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 7. In value engineering, the term value refers to

    • Options
    • A. manufacturing cost of the product
    • B. selling price of the product
    • C. total cost of the product
    • D. utility of the product
    • Discuss
    • 8. A diagram showing the path followed by men and materials while performing a task is known as

    • Options
    • A. string diagram
    • B. flow process chart
    • C. travel chart
    • D. flow diagram
    • Discuss
    • 9. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be

    • Options
    • A. TR
    • B.
    • C. TR + (S - T)R
    • D.
    • Discuss
    • 10. Which one of the following chart gives simultaneously information about the progress of work and machine loading?

    • Options
    • A. Process chart
    • B. Machine load chart
    • C. Man-machine chart
    • D. Gantt chart
    • Discuss