logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Queuing theory is associated with


  • Options
  • A. inventory
  • B. sales
  • C. waiting time
  • D. production time

  • Correct Answer
  • waiting time 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Work sampling is applied for

    • Options
    • A. estimation of the percentage utilisation of machine tools
    • B. estimating the percentage of the time consumed by various job activities
    • C. finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
    • D. all of the above
    • Discuss
    • 2. Which of the following statement is correct?

    • Options
    • A. A-B-C analysis is based on Pareto's principle.
    • B. Simulation can be used for inventory control.
    • C. Economic order quantity formula ignores variations in demand pattern
    • D. all of the above
    • Discuss
    • 3. Simplex method is the method used for

    • Options
    • A. value analysis
    • B. network analysis
    • C. linear programming
    • D. queuing theory
    • Discuss
    • 4. The chart which gives an estimate about the amount of materials handling between various work stations is known as

    • Options
    • A. flow chart
    • B. process chart
    • C. travel chart
    • D. operation chart
    • Discuss
    • 5. The product layout is more amenable to automation than process layout.

    • Options
    • A. True
    • B. False
    • Discuss
    • 6. The type of organisation preferred for a steel industry, is

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 7. Production cost refers to prime cost plus

    • Options
    • A. factory overheads
    • B. factory and administration overheads
    • C. factory, administration and sales overheads
    • D. factory, administration, sales overheads and profit
    • Discuss
    • 8. The determination of standard time in a complex job system is best done through

    • Options
    • A. stop watch time study
    • B. analysis of micromotions
    • C. grouping timing technique
    • D. analysis of standard data system
    • Discuss
    • 9. In a network shown in the below figure, the critical path is along

    • Options
    • A. 1-2-3-4-8-9
    • B. 1-2-3-5-6-7-8-9
    • C. 1-2-3-4-7-8-9
    • D. 1-2-5-6-7-8-9
    • Discuss
    • 10. Fixed position layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss


    Comments

    There are no comments.

Enter a new Comment