  • Question
  • Simplex method is the method used for


  • Options
  • A. value analysis
  • B. network analysis
  • C. linear programming
  • D. queuing theory

  • Correct Answer
  • linear programming 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. The chart which gives an estimate about the amount of materials handling between various work stations is known as

    • Options
    • A. flow chart
    • B. process chart
    • C. travel chart
    • D. operation chart
    • Discuss
    • 2. The product layout is more amenable to automation than process layout.

    • Options
    • A. True
    • B. False
    • Discuss
    • 3. In time study, the rating factor is applied to determine

    • Options
    • A. standard time of a job
    • B. merit rating of the worker
    • C. fixation of incentive rate
    • D. normal time of a worker
    • Discuss
    • 4. In order to avoid excessive multiplication of facilities, the layout preferred is

    • Options
    • A. product layout
    • B. process layout
    • C. group layout
    • D. static layout
    • Discuss
    • 5. Representative time is the average of times recorded by work study man for an operation.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 6. Which of the following statement is correct?

    • Options
    • A. A-B-C analysis is based on Pareto's principle.
    • B. Simulation can be used for inventory control.
    • C. Economic order quantity formula ignores variations in demand pattern
    • D. all of the above
    • Discuss
    • 7. Work sampling is applied for

    • Options
    • A. estimation of the percentage utilisation of machine tools
    • B. estimating the percentage of the time consumed by various job activities
    • C. finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
    • D. all of the above
    • Discuss
    • 8. Queuing theory is associated with

    • Options
    • A. inventory
    • B. sales
    • C. waiting time
    • D. production time
    • Discuss
    • 9. The type of organisation preferred for a steel industry, is

    • Options
    • A. line organisation
    • B. functional organisation
    • C. line and staff organisation
    • D. line, staff and functional organisation
    • Discuss
    • 10. Production cost refers to prime cost plus

    • Options
    • A. factory overheads
    • B. factory and administration overheads
    • C. factory, administration and sales overheads
    • D. factory, administration, sales overheads and profit
    • Discuss