CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
The product layout is more amenable to automation than process layout.
Options
A. True
B. False
Correct Answer
True
Industrial Engineering and Production Management problems
Search Results
1. In time study, the rating factor is applied to determine
Options
A. standard time of a job
B. merit rating of the worker
C. fixation of incentive rate
D. normal time of a worker
Show Answer
Scratch Pad
Discuss
Correct Answer: normal time of a worker
2. In order to avoid excessive multiplication of facilities, the layout preferred is
Options
A. product layout
B. process layout
C. group layout
D. static layout
Show Answer
Scratch Pad
Discuss
Correct Answer: process layout
3. Representative time is the average of times recorded by work study man for an operation.
Options
A. Agree
B. Disagree
Show Answer
Scratch Pad
Discuss
Correct Answer: Agree
4. Which of the following type of layout is suitable for automobile manufacturing concern?
Options
A. product layout
B. process layout
C. fixed position layout
D. combination layout
Show Answer
Scratch Pad
Discuss
Correct Answer: product layout
5. In a line organisation
Options
A. responsibility of each individual is fixed
B. discipline is strong
C. quick decisions are taken
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
6. The chart which gives an estimate about the amount of materials handling between various work stations is known as
Options
A. flow chart
B. process chart
C. travel chart
D. operation chart
Show Answer
Scratch Pad
Discuss
Correct Answer: travel chart
7. Simplex method is the method used for
Options
A. value analysis
B. network analysis
C. linear programming
D. queuing theory
Show Answer
Scratch Pad
Discuss
Correct Answer: linear programming
8. Which of the following statement is correct?
Options
A. A-B-C analysis is based on Pareto's principle.
B. Simulation can be used for inventory control.
C. Economic order quantity formula ignores variations in demand pattern
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: A-B-C analysis is based on Pareto's principle.
9. Work sampling is applied for
Options
A. estimation of the percentage utilisation of machine tools
B. estimating the percentage of the time consumed by various job activities
C. finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
10. Queuing theory is associated with
Options
A. inventory
B. sales
C. waiting time
D. production time
Show Answer
Scratch Pad
Discuss
Correct Answer: waiting time
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology