logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Representative time is the average of times recorded by work study man for an operation.


  • Options
  • A. Agree
  • B. Disagree

  • Correct Answer
  • Agree 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Which of the following type of layout is suitable for automobile manufacturing concern?

    • Options
    • A. product layout
    • B. process layout
    • C. fixed position layout
    • D. combination layout
    • Discuss
    • 2. In a line organisation

    • Options
    • A. responsibility of each individual is fixed
    • B. discipline is strong
    • C. quick decisions are taken
    • D. all of these
    • Discuss
    • 3. In A-B-C analysis, which class of items are generally large in number?

    • Options
    • A. A
    • B. B
    • C. C
    • D. none of these
    • Discuss
    • 4. Bar chart is suitable for

    • Options
    • A. large project
    • B. major work
    • C. minor work
    • D. all of these
    • Discuss
    • 5. Larger end cutting edge angle __________ tool life.

    • Options
    • A. increases
    • B. decreases
    • C. does not effect
    • Discuss
    • 6. In order to avoid excessive multiplication of facilities, the layout preferred is

    • Options
    • A. product layout
    • B. process layout
    • C. group layout
    • D. static layout
    • Discuss
    • 7. In time study, the rating factor is applied to determine

    • Options
    • A. standard time of a job
    • B. merit rating of the worker
    • C. fixation of incentive rate
    • D. normal time of a worker
    • Discuss
    • 8. The product layout is more amenable to automation than process layout.

    • Options
    • A. True
    • B. False
    • Discuss
    • 9. The chart which gives an estimate about the amount of materials handling between various work stations is known as

    • Options
    • A. flow chart
    • B. process chart
    • C. travel chart
    • D. operation chart
    • Discuss
    • 10. Simplex method is the method used for

    • Options
    • A. value analysis
    • B. network analysis
    • C. linear programming
    • D. queuing theory
    • Discuss


    Comments

    There are no comments.

Enter a new Comment