CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
In a line organisation
Options
A. responsibility of each individual is fixed
B. discipline is strong
C. quick decisions are taken
D. all of these
Correct Answer
all of these
Industrial Engineering and Production Management problems
Search Results
1. In A-B-C analysis, which class of items are generally large in number?
Options
A. A
B. B
C. C
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: C
2. Bar chart is suitable for
Options
A. large project
B. major work
C. minor work
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: minor work
3. Larger end cutting edge angle __________ tool life.
Options
A. increases
B. decreases
C. does not effect
Show Answer
Scratch Pad
Discuss
Correct Answer: decreases
4. A left hand tool on a lathe cuts most efficiently when it travels
Options
A. from left to right end of the lathe bed
B. from right to left end of the lathe bed
C. with the help of a compound slide
D. across the bed
Show Answer
Scratch Pad
Discuss
Correct Answer: from left to right end of the lathe bed
5. If the helix angle of the drill is made __________ 30°, then the torque required to drive the drill at a given feed will be more.
Options
A. equal to
B. less than
C. more than
Show Answer
Scratch Pad
Discuss
Correct Answer: less than
6. Which of the following type of layout is suitable for automobile manufacturing concern?
Options
A. product layout
B. process layout
C. fixed position layout
D. combination layout
Show Answer
Scratch Pad
Discuss
Correct Answer: product layout
7. Representative time is the average of times recorded by work study man for an operation.
Options
A. Agree
B. Disagree
Show Answer
Scratch Pad
Discuss
Correct Answer: Agree
8. In order to avoid excessive multiplication of facilities, the layout preferred is
Options
A. product layout
B. process layout
C. group layout
D. static layout
Show Answer
Scratch Pad
Discuss
Correct Answer: process layout
9. In time study, the rating factor is applied to determine
Options
A. standard time of a job
B. merit rating of the worker
C. fixation of incentive rate
D. normal time of a worker
Show Answer
Scratch Pad
Discuss
Correct Answer: normal time of a worker
10. The product layout is more amenable to automation than process layout.
Options
A. True
B. False
Show Answer
Scratch Pad
Discuss
Correct Answer: True
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology