1 |
22 |
3 |
22 |
2 |
91 |
2 |
77 |
2 |
91 |
Then, n(S) | = number of ways of drawing 3 balls out of 15 | |||
= 15C3 | ||||
|
||||
= 455. |
Let E = event of getting all the 3 red balls.
∴ n(E) = 5C3 = 5C2 = | (5 x 4) | = 10. |
(2 x 1) |
∴ P(E) = | n(E) | = | 10 | = | 2 | . |
n(S) | 455 | 91 |
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.