C.P. of 1 orange = Rs. | ❨ | 350 | ❩ | = Rs. 3.50 |
100 |
S.P. of 1 orange = Rs. | ❨ | 48 | ❩ | = Rs. 4 |
12 |
∴ Gain% = | ❨ | 0.50 | x 100 | ❩% | = | 100 | % = 14 | 2 | % |
3.50 | 7 | 7 |
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.