Speed = | ❨ | 78 x | 5 | ❩ | m/sec | = | ❨ | 65 | ❩ | m/sec. |
18 | 3 |
Time = 1 minute = 60 seconds.
Let the length of the tunnel be x metres.
Then, | ❨ | 800 + x | ❩ | = | 65 |
60 | 3 |
⟹ 3(800 + x) = 3900
⟹ x = 500.
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38