  • 16 men and 12 women can complete a work in 20 days. 18 women can complete the same work in 40 days. In how many days will 12 men 27 women complete the same work?


  • Options
  • A. 16 days
  • B. 18 days
  • C. 19 days
  • D. 21 days

  • Correct Answer
  • 16 days 

    Explanation

    (16M + 12W) x 20 = 18W x 40

    => 2M = 3W

    Then,
    Convert all men into women

    12M + 27W = 27 + 12 x 3/2W = 45W

    Let number of days required be 'D'

    => 18 x 40 = 45 x D

    => D = 16 days.

  • Tags: AIEEE, Bank Exams, CAT, GATE, Analyst, Bank Clerk, Bank PO

    Time and Work problems


    Search Results


    • 1. Twenty men can do a work in eighteen days. Eighteen women can complete the same work in fifteen days. What is the ratio between the capacity of a woman and a man ?

    • Options
    • A. 4:5
    • B. 3:4
    • C. 4:3
    • D. 2:3
    • Discuss
    • 2. A can complete 9/10 part of a work in 31 days. After that, with the help of B he can complete the remaining work in 4 days. In how many days will A and B together can complete that work ?

    • Options
    • A. 36
    • B. 40
    • C. 42
    • D. 38
    • Discuss
    • 3. Three men, four women and six children can complete a work in 9 days. A women does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 9 days?

    • Options
    • A. 7
    • B. 8
    • C. 9
    • D. 6
    • Discuss
    • 4. X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished?

    • Options
    • A. 1/3
    • B. 2/3
    • C. 1/6
    • D. 5/6
    • Discuss
    • 5. P can do a piece of work in 5 less days than Q. If both of them can do the same work in 1119 days, in how many days will Q alone do the same work ?

    • Options
    • A. 24 days
    • B. 25 days
    • C. 20 days
    • D. 19 days
    • Discuss
    • 6. A tank has an inlet and outlet pipe. The inlet pipe fills the tank completely in 2 hours when the outlet pipe is plugged. The outlet pipe empties the tank completely in 6 hours when the inlet pipe is pluggeed. If there is a lekage also which is capable of draining out the liquid from the tank at half of the rate of outet pipe,them what is the time taken to fill the emty tank when both the pipes are opened?

    • Options
    • A. 3 hours
    • B. 4 hours
    • C. 5 hours
    • D. None of these
    • Discuss
    • 7. 28 Men and 52 women working together completes a work in 22.5 days. 35 men and 65 women working together on same work will complete it in how many days?

    • Options
    • A. 16
    • B. 18
    • C. 19
    • D. 21
    • Discuss
    • 8. In a hostel, there was food for 1000 students for one month. After 10 days, 1000 more students joined the hostel. How long would the students be able to carry on with the remaining food?

    • Options
    • A. 10 days
    • B. 15 days
    • C. 20 days
    • D. 5 days
    • Discuss
    • 9. 50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?

    • Options
    • A. 50 days
    • B. 48 days
    • C. 47.5 days
    • D. 49 days
    • Discuss
    • 10. Adam and Smith are working on a project. Adam takes 6 hrs to type 36 pages on a computer, while Smith takes 5 hrs to type 40 pages. How much time will they take, working together on two different computers to type a project of 120 pages?

    • Options
    • A. 8 hrs 45 min
    • B. 8 hrs 42 min
    • C. 8 hrs
    • D. 8 hrs 34 min
    • Discuss