Ans.
Given that length of first train + length of second train = 660
Speed of first train : Speed of second train = 5:8 =5x : 8x
Time taken to cross the poll by two trains = 4:3 =4y:3y
Now ,
(5x*4y) + (8x*3y) = 660
44xy = 660
xy = 15
L1 - L2 = 24xy -20xy = 4xy = 60 m
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.