Let marks obtained by S = M
R's marks = 0.80M
Q's marks = 1.25 (0.80M)
P's marks = (0.90) (1.25) (0.80M)
= 0.9M
But 0.9M = 360
M = ?
M = 400
Hence % of marks obtained by S
= 400/500 x 100 = 80%.
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.