Length of the first carpet = (1.44)(6) = 8.64 cm
Area of the second carpet = 8.64(1 + 40/100) 6 (1 + 25/100)
= 51.84(1.4)(5/4) sq m = (12.96)(7) sq m
Cost of the second carpet = (45)(12.96 x 7) = 315 (13 - 0.04) = 4095 - 12.6 = Rs. 4082.40
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.