Let the required length be x meters
More men, More length built (Direct proportion)
Less days, Less length built (Direct Proportion)
=> (20 x 6 x X)=(35 x 3 x 56)
=> x = 49
Hence, the required length is 49 m.
Originally let there be x men.
Less men, More days (Indirect Proportion)
Therefore, (x-10) : x :: 100 :110
=> (x - 10) * 110 = x * 100 => x= 110
Let the required no of hours be x. Then
Less men , More hours (Indirct Proportion)
Therefore, 15:36 ::25:x
=> (15 x X)=(36 x 25) => x = 60
Hence, 15 men can do it in 60 hours.