Here, n(S) = 6 x 6 = 36 and E = Event of getting a number other than 4 on any dice
= {(1, 1), (1, 2), (1, 3), (1, 5), (1, 6), (2, 1), (2, 2) , (2, 3) , (2, 5), (2, 6), (3, 1), (3, 2), (3, 3), (3, 5), (3, 6), (5, 1) , (5, 2) , (5, 3), (5, 5), (5, 6), (6, 1), (6, 2), (6, 3), (6, 5), (6, 6) }
? P(E) = n(E) / n(S) = 25/36
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38