Let breadth = b meters.
then, length = 3b/2 meters
? b x 3b/2 = 2/3 X 10000
? b2 = (4 x 10000)/9
? b = ( 2 X 100)/3 m
? Length = (3/2) x (2/3) x 100 m
= 100 m
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.