Other side = ?5 2 - 42
= ? 9
=3 m
So The area of the rectangular field = 4 x 3
= 12 m2
perimeter = total cost / cost per m = 10080 /20 = 504m
side of the square = 504/4 = 126m
breadth of the pavement = 3m
side of inner square = 126 - 6 = 120m
area of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq m
cost of pavement = 246*6*50 = Rs. 73800
NOTE: When a century year leaves a remiander 0, when divided by 400 then it is a leap year (366 days).
So, 1200 has 366 days.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.