Give, time = 42 months.
= (42/12) yr = 31/2 yr
= 7 half - yr,
rate = 13/2% half - yearly
SI = (20000 x 13 x 7)/(100 x 2) = ? 9100
? Amount (A) = 20000 + 9100
= ? 29100
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.