Let the rates be R1% and R2%.
Then, (500 x R1 x 2)/ 100 - (500 x R2 x 2)/ 100 = 2.5
? 10(R1 - R2) = 2.5
? Req difference = R1 - R2 = 0.25%
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.