The required difference in amount and principal is SI = A - P
Here, P = ? 4000, R = 5% T = 4 yr
According to the formula.
SI = (P x R x T) /100
= (4000 x 5 x 4)/100
= ? 800
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.