logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.


  • Options
  • A. System Development Life Cycle
  • B. CASE tool
  • C. Phased Conversion
  • D. Success factors
  • E. Move of the above.

  • Correct Answer
  • Success factors 


  • System Analysis and Design problems


    Search Results


    • 1. Which of the following is not an advantage of the structured approach to system development?

    • Options
    • A. it focuses on the physical aspects of the system
    • B. the system specification is very graphic
    • C. the user area is studied thoroughly
    • D. the documentation is Cumulative
    • E. None of the above
    • Discuss
    • 2. Decision tree uses

    • Options
    • A. pictorial depiction of alternate conditions
    • B. nodes and branches
    • C. consequences of various depicted alternates
    • D. All of the above
    • E. None of the above
    • Discuss
    • 3. A system investigation may result from

    • Options
    • A. an analysis investigation
    • B. a scheduled systems reviewed
    • C. a manager's formal request
    • D. All of the above
    • E. None of the above
    • Discuss
    • 4. The longest method of conversion is

    • Options
    • A. direct
    • B. parallel
    • C. phased
    • D. pilot
    • E. None of the above
    • Discuss
    • 5. Conversion method in which users, being used to an old system, continue to use the old system, alongside the new system, is

    • Options
    • A. multi processing
    • B. multitasking
    • C. parallel run
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. The procedure for evaluating the relative performance of different computers, is done by the process called

    • Options
    • A. batch processing
    • B. sequential processing
    • C. bench marking
    • D. All of the above
    • E. None of the above
    • Discuss
    • 7. An audit trial is

    • Options
    • A. designed to permit tracing of any input record or process performed on a system, back toits original sources
    • B. post-auditing the system after its implementation
    • C. test data used by the system auditor
    • D. All of the above
    • E. None of the above
    • Discuss
    • 8. The black box concept is based on the assumption(s) that;

    • Options
    • A. the suprasystem is stable
    • B. black boxes are dependent or environments
    • C. the relationship between the inputs and output is stable
    • D. All of the above
    • E. None of the above
    • Discuss
    • 9. A couple:

    • Options
    • A. is a data item that moves from one module to another
    • B. is represented by a line joining two modules
    • C. means that the upper module has the capability of calling the lower module
    • D. none of the above
    • E. None of the above
    • Discuss
    • 10. The instruction "If it's raining outside, then take an umbrella to work" is an example of the _____ structure,

    • Options
    • A. Control
    • B. Repetition
    • C. Selection
    • D. Sequence
    • E. Switching
    • Discuss


    Comments

    There are no comments.

Enter a new Comment