logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • The first step in systems Development Life Cycle is


  • Options
  • A. database design
  • B. system design
  • C. preliminary investigation and analysis
  • D. graphical user interface
  • E. None of the above

  • Correct Answer
  • preliminary investigation and analysis 


  • System Analysis and Design problems


    Search Results


    • 1. Graphic representation of the control logic of processing functions or modules representing a system, is known as:

    • Options
    • A. Structured analysis
    • B. Structured chart
    • C. Structured English
    • D. System Flow chart
    • E. None of the above
    • Discuss
    • 2. The model base cannot be prepared until

    • Options
    • A. the computer has been selected
    • B. the MIS staff has been acquired and organized
    • C. the preparation of physical facilities
    • D. both (a) and (b)
    • E. None of the above
    • Discuss
    • 3. A programmer reviews the accuracy of an algorithm by _____ it.

    • Options
    • A. Analyzing
    • B. Coding
    • C. Desk-checking
    • D. Planning
    • E. None of the above
    • Discuss
    • 4. Which of the following control structures is used in every program?

    • Options
    • A. Repetition
    • B. Selection
    • C. Sequence
    • D. Switching
    • E. None of the above
    • Discuss
    • 5. Which of the following tools is not used in modeling the new system?

    • Options
    • A. decision tables
    • B. data dictionary
    • C. data-flow diagrams
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. The four icons used in building Data Flow Diagram are

    • Options
    • A. Flow, Source, Store, Process
    • B. Flow, Process, Source, Store
    • C. Flow, Process, Source/Destination, Store
    • D. Source, Process, Destination, Store
    • E. None of the above
    • Discuss
    • 7. Which of the following is not a part of a Data Flow Diagram?

    • Options
    • A. disk storage
    • B. arrow
    • C. Data store
    • D. process represented by a bubble circle (circle)
    • E. None of the above
    • Discuss
    • 8. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called as

    • Options
    • A. crash conversion
    • B. phased conversion
    • C. pilot conversion
    • D. parallel run
    • E. None of the above
    • Discuss
    • 9. Which of the following is an integrated collection of data with minimum redundancy, so that different applications can use the required data.

    • Options
    • A. records
    • B. file
    • C. DBMS
    • D. schema
    • E. None of the above
    • Discuss
    • 10. The black-box concept:

    • Options
    • A. is invoked by describing a system in terms of inputs and outputs, leaving the transformation process a black box.
    • B. assumes that the black box is independent
    • C. assumes that inputs and outputs will remain stable
    • D. All of the above
    • E. None of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment