logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • The model base cannot be prepared until


  • Options
  • A. the computer has been selected
  • B. the MIS staff has been acquired and organized
  • C. the preparation of physical facilities
  • D. both (a) and (b)
  • E. None of the above

  • Correct Answer
  • both (a) and (b) 


  • System Analysis and Design problems


    Search Results


    • 1. A programmer reviews the accuracy of an algorithm by _____ it.

    • Options
    • A. Analyzing
    • B. Coding
    • C. Desk-checking
    • D. Planning
    • E. None of the above
    • Discuss
    • 2. Which of the following control structures is used in every program?

    • Options
    • A. Repetition
    • B. Selection
    • C. Sequence
    • D. Switching
    • E. None of the above
    • Discuss
    • 3. Which of the following tools is not used in modeling the new system?

    • Options
    • A. decision tables
    • B. data dictionary
    • C. data-flow diagrams
    • D. All of the above
    • E. None of the above
    • Discuss
    • 4. An open rectangle

    • Options
    • A. defines a source or destination of system data
    • B. identifies data flow
    • C. represents a process that transforms incoming data flow(s) into outgoing data flows
    • D. is a data store-data at rest, or a temporary repository of data
    • E. None of the above
    • Discuss
    • 5. In Data structure, main characteristic of "ring" is :

    • Options
    • A. last, record points to the first record
    • B. first record points only to the last record
    • C. many records point to one record
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. Graphic representation of the control logic of processing functions or modules representing a system, is known as:

    • Options
    • A. Structured analysis
    • B. Structured chart
    • C. Structured English
    • D. System Flow chart
    • E. None of the above
    • Discuss
    • 7. The first step in systems Development Life Cycle is

    • Options
    • A. database design
    • B. system design
    • C. preliminary investigation and analysis
    • D. graphical user interface
    • E. None of the above
    • Discuss
    • 8. The four icons used in building Data Flow Diagram are

    • Options
    • A. Flow, Source, Store, Process
    • B. Flow, Process, Source, Store
    • C. Flow, Process, Source/Destination, Store
    • D. Source, Process, Destination, Store
    • E. None of the above
    • Discuss
    • 9. Which of the following is not a part of a Data Flow Diagram?

    • Options
    • A. disk storage
    • B. arrow
    • C. Data store
    • D. process represented by a bubble circle (circle)
    • E. None of the above
    • Discuss
    • 10. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called as

    • Options
    • A. crash conversion
    • B. phased conversion
    • C. pilot conversion
    • D. parallel run
    • E. None of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment