logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • Which of the following is done in order a data in phase 1 of the system development life cycle?


  • Options
  • A. reviewing policies and procedures
  • B. conducting interviews
  • C. using questionnaires to conduct surveys.
  • D. All of the above
  • E. None of the above

  • Correct Answer
  • All of the above 


  • System Analysis and Design problems


    Search Results


    • 1. The term used to refer to the checking of outputs of a computer, with the corresponding input documents, is called

    • Options
    • A. auditing around the computer
    • B. auditing through the computer
    • C. process control
    • D. beta-test
    • E. None of the above
    • Discuss
    • 2. A pseudocode is

    • Options
    • A. a machine code
    • B. a computer generated random number
    • C. a protocol used in data communication
    • D. an easy way to communicate the logic of a program, in English like statements
    • E. None of the above
    • Discuss
    • 3. Which of the following statements is true

    • Options
    • A. as parallel run involves two different terminals accessing a common database
    • B. computers are essential for systems Analysis
    • C. Flow of information in an organization is always vertical
    • D. alpha testing is the verification process a system goes through for the first time
    • E. None of the above
    • Discuss
    • 4. Announcement of MIS implementation is made by

    • Options
    • A. operational level managers
    • B. tactical level managers
    • C. the president
    • D. All of the above
    • E. None of the above
    • Discuss
    • 5. Which of the following is the most critical requirement of a Passenger Reservation System?

    • Options
    • A. ease of programming
    • B. response time
    • C. graphical user Interface
    • D. printing of tickets
    • E. None of the above
    • Discuss
    • 6. You record the algorithm in the _____ column of the IPO chart.

    • Options
    • A. Input
    • B. Output
    • C. Processing
    • D. Purpose
    • E. None of the above
    • Discuss
    • 7. Procedure development occurs within the

    • Options
    • A. structured design phase
    • B. conversion phase
    • C. system building phase
    • D. maintenance
    • E. None of the above
    • Discuss
    • 8. A data flow diagram is

    • Options
    • A. the modern version of flowchart
    • B. mainly used at the systems specification stage.
    • C. the primary output of the systems design phase
    • D. All of the above
    • E. None of the above
    • Discuss
    • 9. A Pseudocode is

    • Options
    • A. a machine - level code
    • B. a random number
    • C. a flow chart
    • D. Structured English to communicate the logic of a program
    • E. None of the above
    • Discuss
    • 10. Data dictionary contains detail of

    • Options
    • A. data structures
    • B. data flows
    • C. data stores
    • D. All of the above
    • E. None of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment