The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m3) that will be lost per day, by seepage is (rounded to the nearest number):
Options
A. 55
B. 57
C. 59
D. 61
Correct Answer
61
More questions
1. The digested sludge from septic tanks, is removed after a maximum period of