If a seller recovers his capital along with accumulated compensating interest not in one single lumpsum payment but in periodical equal payments, over time :
Options
A. Capital Recovery Annuity fs availed
B. Present work Annuity is availed
C. Sinking Fund Annuity is availed
D. Sinking Fund Annuity is availed
Correct Answer
Capital Recovery Annuity fs availed
Engineering Economy problems
Search Results
1. The construction manager uses the estimate of the project
Options
A. to tell the owner of the project to take his/her financial decision.
B. to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
C. to develop bids on the project.
D. to control the project during its construction.
3. Renu Bala deposits Rs 1200 now, Rs 800 two years from now and Rs 1000 five years from now. If the savings bank's rate of interest in 5%, she will receive an amount of Rs X 10 years from now, where X is
9. Three reservoirs A, B and C are interconnected by pipes as shown in the below figure Water surface elevations in the reservoirs and the Piezometric Head at the junction J are indicated in the below figure.
10. The slope of the elastic curve at the free end of a cantilever beam of span L, and with fluxural rigidity EI, subjected to uniformly distributed load of intensity w is