CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Airport Engineering
Comments
Question
For night landing, the thresholds are lighted
Options
A. green
B. red
C. white
D. yellow
Correct Answer
green
Airport Engineering problems
Search Results
1. If lift off distance of an craft is 2000 m, the clear way at the end of the runway should not be less than
Options
A. 145 m
B. 152.5 m
C. 162.5 m
D. 172.5 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 172.5 m
2. Effective length of a runway is the distance between
Options
A. ends of the runway
B. point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway
C. point of intersection of the glide path and the extended plane of the runway surface and the other end of the runway
D. ends of the clear way on either side.
Show Answer
Scratch Pad
Discuss
Correct Answer: point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway
3. For the proposed air port, the survey project provides
Options
A. master plan
B. topograhic plan
C. grading plan
D. drainage plan
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. Pick up the component not applicable to aeroplanes
Options
A. wings
B. engines
C. air screw
D. fuse lage
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
5. The length of runway is increased per 300 m rise above M.S.L.
Options
A. 3%
B. 4%
C. 5%
D. 6%
E. 7%
Show Answer
Scratch Pad
Discuss
Correct Answer: 7%
6. The height of the pilot's eye above the runway surface is assumed
Options
A. 1 m
B. 3 m
C. 4 m
D. 5 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 3 m
7. The length of a runway under standard atmospheric conditions is 1800 m. If the actual reduced level of the site is 1200 m, the design length of the runway is
Options
A. 2360 m
B. 2460 m
C. 2560 m
D. 2660 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 2560 m
8. In instrument landing system
Options
A. L.O.M. and L.M.M. are installed on one side and Localizer antenna on the other side
B. L.O.M. and Localizer are installed on one side and L.M.M. on the other side
C. Localizer and L.M.M. are installed on one side and L.O.M. on the other side
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: L.O.M. and L.M.M. are installed on one side and Localizer antenna on the other side
9. Two single runways may be arranged so as to have
Options
A.
L
-shape
B.
T
-shape
C.
X
-shape
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. The maximum value of the angle of turning of the nose gear large jet aircrafts, is limited to
Options
A. 20°
B. 30°
C. 45°
D. 60°
Show Answer
Scratch Pad
Discuss
Correct Answer: 60°
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering