CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Highway Engineering
Comments
Question
Horizontal curves on highways are provided
Options
A. to break the monotony of driving
B. to discourage the tendency to increase speed
C. to decrease the mental strain on drivers
D. all the above.
Correct Answer
all the above.
Highway Engineering problems
Search Results
1. Pick up the correct statement from the following:
Options
A. Various geometric design features and generally guided by ruling design speed
B. The design speed for a given highway should preferably be uniform
C. Abrupt change in the design speed should not be permitted
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. Pick up the correct statement from the following:
Options
A. Borrow pits are located out side the right of way
B. Borrow pits may be located on either side of the right of way
C. Spoil bank is located on one side of the right of way
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
3. Along a hill road, a side drain is provided on
Options
A. outer side of a spur curve
B. outer side of a re-entrant curve
C. outer side of both (
a
) and (
b
)
D. inner side of both (
a
) and (
b
)
Show Answer
Scratch Pad
Discuss
Correct Answer: inner side of both (
a
) and (
b
)
4. In welded wire mesh, the longitudinal wire is placed at
Options
A. 10 cm centres
B. 15 cm centres
C. 20 cm centres
D. 25 cm centres
E. 30 cm centres
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm centres
5. Thickness of broken centre line markings for a four lane road, is generally kept
Options
A. 10 cm
B. 12 cm
C. 15 cm
D. 18 cm
E. 20 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
6. If the difference in elevation of an edge of the pavement 9 m wide and its crown is 15 cm, the camber of the pavement, is
Options
A. 1 in 60
B. 1 in 45
C. 1 in 30
D. 1 in 15
E. 1 in 7.5
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 in 30
7. Gradient resistance of moving vehicles along down slopes, is
Options
A. + 7 kg/tonne
B. + 9 kg/tonne
C. - 9 kg/tonne
D. - 7 kg/tonne
Show Answer
Scratch Pad
Discuss
Correct Answer: - 9 kg/tonne
8. Reduction of load capacity in a ruling gradient of
Options
A. 1 in 10, is 10%
B. 1 in 15, is 15%
C. 1 in 20, is 10%
D. 1 in 25, is 25%
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 in 20, is 10%
9. A subsidiary area in a carriageway placed so as to control the movement of the traffic, is
Options
A. median strip
B. island
C. flower bed
D. refuge.
Show Answer
Scratch Pad
Discuss
Correct Answer: island
10. Widening of the roads on curves in hilly region, is done
Options
A. on the outer side
B. on the inner side
C. on the outer and inner sides equally
D. less on outer side and more on inner side.
Show Answer
Scratch Pad
Discuss
Correct Answer: on the inner side
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering