logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Highway Engineering Comments

  • Question
  • The traffic manoeuvre means


  • Options
  • A. diverging
  • B. merging
  • C. crossing
  • D. all the above.

  • Correct Answer
  • all the above. 


  • Highway Engineering problems


    Search Results


    • 1. 1.R.T.D.A. (Indian Roads and Transport Development Association) was set up at Bombay in

    • Options
    • A. 1907
    • B. 1917
    • C. 1927
    • D. 1937
    • E. 1942
    • Discuss
    • 2. An exceptional grade may be provided upto 1 in 12 along hill roads, if the length does not exceed

    • Options
    • A. 45 m per km
    • B. 60 m per km
    • C. 75 m per km
    • D. 90 m per km
    • E. 100 m per km
    • Discuss
    • 3. The width formation of a road means the width of

    • Options
    • A. carriageway
    • B. pavement and shoulders
    • C. embankment at ground level
    • D. embankment at the top level.
    • Discuss
    • 4. For a comfortable travel on Highways, the centrifugal ratio should not exceed

    • Options
    • A. 0.10
    • B. 0.15
    • C. 0.20
    • D. 0.25
    • E. 0.30
    • Discuss
    • 5. Round-abouts are not suitable if number of vehicles exceed

    • Options
    • A. 3000
    • B. 4000
    • C. 5000
    • D. 6000
    • Discuss
    • 6. To compensate the loss of tractive force of vehicles along curves of radius R, the percentage reduction of gradient, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • E.
    • Discuss
    • 7. For clear distinct vision, images of obstructions should fall on the retina with a cone of

    • Options
    • A. 2°
    • B. 3°
    • C. 4°
    • D. 5°
    • E. 6°
    • Discuss
    • 8. Following type of pavement is generally known as flexible pavement

    • Options
    • A. water-bound macadam roads
    • B. stabilised soil roads
    • C. road constructed with various layers of building material well compacted
    • D. all the above.
    • Discuss
    • 9. Volume of traffic which is due to improvement carried out in adjacent area, is known as

    • Options
    • A. development traffic
    • B. generated traffic growth
    • C. normal traffic growth
    • D. current traffic.
    • Discuss
    • 10. The total value of extra widening required at a horizontal curve on a two lane hill road of radius 42 m for a design speed of 50 kmph and for vehicles with wheel base 6 m, is

    • Options
    • A. 0.500 m
    • B. 0.589 m
    • C. 1.089 m
    • D. 0.089 m
    • Discuss


    Comments

    There are no comments.

Enter a new Comment