CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Highway Engineering
Comments
Question
An Executive Engineer of roads, executes works under direct control of
Options
A. Superintending Engineer
B. Secretary to the Govt
C. Chief Engineer
D. None of these.
Correct Answer
Superintending Engineer
Highway Engineering problems
Search Results
1. The desirable camber for straight roads with thin bituminous surfacing, is
Options
A. 1 in 33 to 1 in 25
B. 1 in 40 to 1 in 33
C. 1 in 150 to 1 in 140
D. 1 in 160 to 1 in 140
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 in 150 to 1 in 140
2. Minimum thickness of the base of a flexible pavement, is
Options
A. 10 cm
B. 15 cm
C. 20 cm
D. 25 cm
E. 30 cm.
Show Answer
Scratch Pad
Discuss
Correct Answer: 10 cm
3. When an up gradient of a highway meets a downgrade, the vertical curve provided, is known as
Options
A. valley curve
B. sag curve
C. summit curve
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: summit curve
4. If the coefficient of friction on the road surface is 0.15 and a maximum super-elevation 1 in 15 is provided, the maximum speed of the vehicles on a curve of 100 metre radius, is
Options
A. 32.44 km/hour
B. 42.44 kg/hour
C. 52.44 km/hour
D. 62.44 km/hour
E. 72.44 km/hour
Show Answer
Scratch Pad
Discuss
Correct Answer: 52.44 km/hour
5. Intermediate catch water drains are provided only, if
Options
A. catchment area of the watershed above road is large
B. intensity of rainfall is heavy
C. single catch water drain is inadequate
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. Normal formation width of a hill road for one-way traffic, is
Options
A. 3.6 m
B. 4.8 m
C. 6.6 m
D. 7.2 m
E. 8 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 4.8 m
7. Raising of outer edge of a road with respect to inner edge, is known
Options
A. super elevation
B. cant
C. banking
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. From the point of tangency before an intersection, the route markers are fixed at a distance of
Options
A. 15 m to 30 m
B. 20 m to 35 m
C. 40 m to 50 m
D. 50 m to 75 m
E. 100 m to 150
Show Answer
Scratch Pad
Discuss
Correct Answer: 100 m to 150
9. If
V
is the design speed in km/hour and
R
is the radius of the curve of a hill road, the super-elevation
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
10. The inventor of road making as a building science, was
Options
A. Sully
B. Tresguet
C. Telford
D. Macadam.
Show Answer
Scratch Pad
Discuss
Correct Answer: Sully
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering