  • Question
  • When an up gradient of a highway meets a downgrade, the vertical curve provided, is known as


  • Options
  • A. valley curve
  • B. sag curve
  • C. summit curve
  • D. all the above.

  • Correct Answer
  • summit curve 


  • Highway Engineering problems


    Search Results


    • 1. If the coefficient of friction on the road surface is 0.15 and a maximum super-elevation 1 in 15 is provided, the maximum speed of the vehicles on a curve of 100 metre radius, is

    • Options
    • A. 32.44 km/hour
    • B. 42.44 kg/hour
    • C. 52.44 km/hour
    • D. 62.44 km/hour
    • E. 72.44 km/hour
    • Discuss
    • 2. Intermediate catch water drains are provided only, if

    • Options
    • A. catchment area of the watershed above road is large
    • B. intensity of rainfall is heavy
    • C. single catch water drain is inadequate
    • D. all the above.
    • Discuss
    • 3. A gradient along which the vehicle does not require any tractive effort to maintain a specified speed, is known as

    • Options
    • A. ruling gradient
    • B. pushing gradient
    • C. floating gradient
    • D. minimum gradient
    • Discuss
    • 4. Newly constructed pavement with ordinary Portland cement attains its working strength after

    • Options
    • A. 7 days
    • B. 14 days
    • C. 21 days
    • D. 28 days
    • E. 42 days
    • Discuss
    • 5. In case of a multi-lane road, overtaking is generally permitted

    • Options
    • A. from right
    • B. from left
    • C. from both sides right and left
    • D. not at all.
    • Discuss
    • 6. Minimum thickness of the base of a flexible pavement, is

    • Options
    • A. 10 cm
    • B. 15 cm
    • C. 20 cm
    • D. 25 cm
    • E. 30 cm.
    • Discuss
    • 7. The desirable camber for straight roads with thin bituminous surfacing, is

    • Options
    • A. 1 in 33 to 1 in 25
    • B. 1 in 40 to 1 in 33
    • C. 1 in 150 to 1 in 140
    • D. 1 in 160 to 1 in 140
    • E. none of these.
    • Discuss
    • 8. An Executive Engineer of roads, executes works under direct control of

    • Options
    • A. Superintending Engineer
    • B. Secretary to the Govt
    • C. Chief Engineer
    • D. None of these.
    • Discuss
    • 9. Normal formation width of a hill road for one-way traffic, is

    • Options
    • A. 3.6 m
    • B. 4.8 m
    • C. 6.6 m
    • D. 7.2 m
    • E. 8 m
    • Discuss
    • 10. Raising of outer edge of a road with respect to inner edge, is known

    • Options
    • A. super elevation
    • B. cant
    • C. banking
    • D. all the above.
    • Discuss