CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Highway Engineering
Comments
Question
Parapet walls along hill roads, are provided
Options
A. to retain the back filling
B. to prevent the hill from sliding
C. to prevent the wheels of the vehicle from coming on the retaining wall
D. none of these.
Correct Answer
to prevent the wheels of the vehicle from coming on the retaining wall
Highway Engineering problems
Search Results
1. The correct formula for calculating superelevation for the hill roads, is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
2. If the velocity of moving vehicles on a road is 24 km/per hour, stopping distance is 19 metres and average length of vehicles is 6 metres, the basic capacity of lane, is
Options
A. 500 vehicles per hour
B. 700 vehicles per hour
C. 1000 vehicles per hour
D. 1250 vehicles per hour
Show Answer
Scratch Pad
Discuss
Correct Answer: 1000 vehicles per hour
3. For a vehicle moving with a speed of 80 km per hour, the brake reaction time, in ordinary cases, is
Options
A. 1 sec
B. 1.5 sec
C. 2.0 sec
D. 2.5 sec
E. 3.0 sec
Show Answer
Scratch Pad
Discuss
Correct Answer: 2.5 sec
4. The maximum distance of the apex of a vertical curve of length
L
from the point of intersection of two grades +
g
1
%, and -
g
2
% (
g
1
>
g
2
), is
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
5. If the rate of change of grade permitted along a vertical curve is
r
and total change of grade is
g
%, the length
L
of the curve to be provided, is
Options
A.
B.
C.
D.
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer:
6. Speed regulations on roads is decided on the basis of
Options
A. 60 percentile cumulative frequency
B. 75 percentile cumulative frequency
C. 80 percentile cumulative frequency
D. 85 percentile cumulative frequency.
Show Answer
Scratch Pad
Discuss
Correct Answer: 85 percentile cumulative frequency.
7. In case of a multi-lane road, overtaking is generally permitted
Options
A. from right
B. from left
C. from both sides right and left
D. not at all.
Show Answer
Scratch Pad
Discuss
Correct Answer: from both sides right and left
8. Newly constructed pavement with ordinary Portland cement attains its working strength after
Options
A. 7 days
B. 14 days
C. 21 days
D. 28 days
E. 42 days
Show Answer
Scratch Pad
Discuss
Correct Answer: 28 days
9. A gradient along which the vehicle does not require any tractive effort to maintain a specified speed, is known as
Options
A. ruling gradient
B. pushing gradient
C. floating gradient
D. minimum gradient
Show Answer
Scratch Pad
Discuss
Correct Answer: floating gradient
10. Intermediate catch water drains are provided only, if
Options
A. catchment area of the watershed above road is large
B. intensity of rainfall is heavy
C. single catch water drain is inadequate
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering