  • Question
  • Parapet walls along hill roads, are provided


  • Options
  • A. to retain the back filling
  • B. to prevent the hill from sliding
  • C. to prevent the wheels of the vehicle from coming on the retaining wall
  • D. none of these.

  • Correct Answer
  • to prevent the wheels of the vehicle from coming on the retaining wall 


  • Highway Engineering problems


    Search Results


    • 1. The correct formula for calculating superelevation for the hill roads, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 2. If the velocity of moving vehicles on a road is 24 km/per hour, stopping distance is 19 metres and average length of vehicles is 6 metres, the basic capacity of lane, is

    • Options
    • A. 500 vehicles per hour
    • B. 700 vehicles per hour
    • C. 1000 vehicles per hour
    • D. 1250 vehicles per hour
    • Discuss
    • 3. For a vehicle moving with a speed of 80 km per hour, the brake reaction time, in ordinary cases, is

    • Options
    • A. 1 sec
    • B. 1.5 sec
    • C. 2.0 sec
    • D. 2.5 sec
    • E. 3.0 sec
    • Discuss
    • 4. The maximum distance of the apex of a vertical curve of length L from the point of intersection of two grades + g1%, and - g2% (g1 > g2), is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 5. If the rate of change of grade permitted along a vertical curve is r and total change of grade is g%, the length L of the curve to be provided, is

    • Options
    • A.
    • B.
    • C.
    • D.
    • E. none of these.
    • Discuss
    • 6. Speed regulations on roads is decided on the basis of

    • Options
    • A. 60 percentile cumulative frequency
    • B. 75 percentile cumulative frequency
    • C. 80 percentile cumulative frequency
    • D. 85 percentile cumulative frequency.
    • Discuss
    • 7. In case of a multi-lane road, overtaking is generally permitted

    • Options
    • A. from right
    • B. from left
    • C. from both sides right and left
    • D. not at all.
    • Discuss
    • 8. Newly constructed pavement with ordinary Portland cement attains its working strength after

    • Options
    • A. 7 days
    • B. 14 days
    • C. 21 days
    • D. 28 days
    • E. 42 days
    • Discuss
    • 9. A gradient along which the vehicle does not require any tractive effort to maintain a specified speed, is known as

    • Options
    • A. ruling gradient
    • B. pushing gradient
    • C. floating gradient
    • D. minimum gradient
    • Discuss
    • 10. Intermediate catch water drains are provided only, if

    • Options
    • A. catchment area of the watershed above road is large
    • B. intensity of rainfall is heavy
    • C. single catch water drain is inadequate
    • D. all the above.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment