CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Highway Engineering
Comments
Question
Pick up the incorrect statement from the following:
Options
A. Tresguet did not provide the top camber for the drainage of surface water
B. Tresguet provided the top camber for the drainage of surface water
C. Telford provided two layers of stones in the central 5.4 m width and one layer was provided on the sides
D. Macadam provided a camber to the formation at the dug-up state, to drain percolated water.
Correct Answer
Tresguet did not provide the top camber for the drainage of surface water
Highway Engineering problems
Search Results
1. For night travel, the length of a valley curve should be such that the head light beam distance is the same as
Options
A. stopping sight distance
B. overtaking sight distance
C. sum of (
a
) and (
b
)
D. difference of (
a
) and (
b
)
Show Answer
Scratch Pad
Discuss
Correct Answer: stopping sight distance
2. Cement grouted pavement is classified as
Options
A. rigid pavement
B. semi-rigid pavement
C. flexible pavement
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: semi-rigid pavement
3. Any gradient on a road is said to be an exceptional gradient, if it is
Options
A. more than ruling gradient
B. less than average gradient
C. more than floating gradient
D. less than minimum gradient or more than maximum gradient.
Show Answer
Scratch Pad
Discuss
Correct Answer: less than minimum gradient or more than maximum gradient.
4. To prevent movement of moisture from subgrade to road pavement at the same level as that of water-table, thickness of a cut off layer of coarse sand, is
Options
A. 15 cm
B. 20 cm
C. 30 cm
D. 45 cm
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
5. Length of vehicles does not affect
Options
A. extra widening
B. minimum radius of turning
C. passing sight distance
D. width of shoulders
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: width of shoulders
6. If
W
is the weight of a vehicle negotiating an upgrade 1 :
S
along a track having co-efficient of resistance ?, the tractive force
T
is given by
Options
A.
B.
C.
D.
E.
Show Answer
Scratch Pad
Discuss
Correct Answer:
7. According to IRC : 52-1973, for a single lane National Highway in hilly region,
Options
A. width of the carriageway must be 3.75 m
B. shoulders on either side must be 1.25 m
C. total width of the road-way must be 6.25 m
D. total of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: total of the above.
8. Reinforcement in cement concrete slab of road pavements, is placed
Options
A. longitudinally
B. transversely
C. longitudinally and transversely
D. in the form of welded wire mesh
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: in the form of welded wire mesh
9. Road width 8.8 m of two lane National highways or State highways in mountainous terrain
Options
A. excludes the width of parapet (0.6 m)
B. excludes the width of side drain (0.6 m)
C. excludes the width of parapet and side drain
D. includes the width of parapet and side drain
Show Answer
Scratch Pad
Discuss
Correct Answer: excludes the width of parapet and side drain
10. For maximum strength and durability minimum percentage of cement, by weight is
Options
A. 15%
B. 20%
C. 25%
D. 30%
E. 33%
Show Answer
Scratch Pad
Discuss
Correct Answer: 30%
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering