  • Stability of hill slopes depends upon


  • Options
  • A. nature of the slope
  • B. angle of the slope
  • C. geological conditions
  • D. ground water conditions
  • E. all the above.

  • Correct Answer
  • all the above. 


  • Highway Engineering problems


    Search Results


    • 1. Camber in pavements is provided by

    • Options
    • A. straight line method
    • B. parabola method
    • C. straight at the edges and parabolic at the crown
    • D. all the above.
    • Discuss
    • 2. The advantage of providing superelevation on roads, is

    • Options
    • A. higher speed of vehicles
    • B. increased volume of traffic
    • C. reduced maintenance cost of the roads
    • D. draining off rain water quickly
    • E. all the above.
    • Discuss
    • 3. The normal road width of National and State highways

    • Options
    • A. is kept 45 m
    • B. in plain and rolling terrain built-up area, is 30 m
    • C. in mountainous built-up area is 20 m
    • D. All the above.
    • Discuss
    • 4. Transverse joints are provided at distances varying from

    • Options
    • A. 10 m to 15 m
    • B. 12 m to 18 m
    • C. 16 m to 24 m
    • D. 17 m to 27 m
    • E. 25 m to 35 m
    • Discuss
    • 5. The extra widening of pavements recommended by Indian Roads Congress for hill roads having radius 150 metres, is

    • Options
    • A. 1.5 m
    • B. 1.0 m
    • C. 0.5 m
    • D. 0.0 m
    • E. 2.0 m
    • Discuss
    • 6. If N is the algebraic difference of grades, S is the minimum sight distance in metres, the length (L) of a summit curve is

    • Options
    • A.
    • B.
    • C.
    • D.
    • E. none of these.
    • Discuss
    • 7. If the number of lanes on the carriageway of a road is more than two, the total width of lane ways is equal to 3.0 m

    • Options
    • A. + 0.60 m
    • B. + 0.70 m
    • C. + 0.80 xn
    • D. + 0.90 m
    • E. + 1.50 m
    • Discuss
    • 8. Along high ways confirmatory route markers are generally fixed

    • Options
    • A. before the crossing on the left side
    • B. after the crossing on the left side
    • C. before the crossing on the right side
    • D. after the crossing on the right side.
    • Discuss
    • 9. For Indian conditions, the water bound macadam roads, are suitable if daily traffic does not exceed

    • Options
    • A. 2000 tonnes
    • B. 2500 tonnes
    • C. 3000 tonnes
    • D. 3500 tonnes
    • Discuss
    • 10. The desirable camber for straight cement concrete roads, is

    • Options
    • A. 1 in 33 to 1 in 25
    • B. 1 in 40 to 1 in 33
    • C. 1 in 150 to 1 in 140
    • D. 1 in 160 to 1 in 140
    • E. none of these.