CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Supply Engineering
Comments
Question
Pick up the correct statement from the following :
Options
A. Deposition of calcium carbonate on the inside of the well pipe, causes incrustation of the pipe
B. Incrustation of the pipe reduces the discharge
C. Acidic waters cause corrosion of the pipes
D. Corrosion results due to excessive withdrawal of sand along with water
E. All the above.
Correct Answer
All the above.
Water Supply Engineering problems
Search Results
1. Generally, first portion of a logistic curve for the population growth of a developing city, represents the growth of
Options
A. increasing
B. decreasing
C. constant
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: increasing
2. The requirement of water per capita per day, is
Options
A. 90 litres
B. 150 litres
C. 250 litres
D. 400 litres.
Show Answer
Scratch Pad
Discuss
Correct Answer: 90 litres
3. Alum is a
Options
A. coagulant
B. flocculant
C. catalyst
D. disinfectant.
Show Answer
Scratch Pad
Discuss
Correct Answer: coagulant
4. Total flow in stream is known
Options
A. run off
B. stream flow
C. discharge
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. The U.C. (uniformity coefficient)
for the best filter media sand should be
Options
A. 2
B. 3
C. 4
D. 5
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 2
6. Pick up the incorrect statement from the following :
Options
A. Porosity of clay sand soil is 45%
B. Porosity of pure sand is 35%
C. Porosity of sand stone is up to 15%
D. Least porosity is that of granite and quartz
E. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: None of these.
7. The pH value of water is kept slightly less than 7 so that hydrochloride ions may combine with ammonia ions to form
Options
A. Mono-chloramine (NHCl)
B. Di-chloramine (NH
2
Cl)
C. Nitrogen trichloramine (NCl
3
)
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
8. The ensure proper growth of children's teeth, the quantity of flouride used in water mains, is
Options
A. 1 mg/litre
B. 2 mg/litre
C. 3 mg/litre
D. 4 mg/litre
E. 5 mg/litre.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 mg/litre
9. The maximum pressure which the pipe can withstand without any leakage during hydrostatic pressure test, is called
Options
A. Working pressure
B. Design pressure
C. Test pressure
D. Hydrostatic pressure.
Show Answer
Scratch Pad
Discuss
Correct Answer: Test pressure
10. Normal values of overflow rate for sedimentation tanks using coagulants in litres/hr/m
2
, generally range between
Options
A. 250 to 500
B. 500 to 750
C. 750 to 1000
D. 1000 to 1250
Show Answer
Scratch Pad
Discuss
Correct Answer: 1000 to 1250
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering