The formula Q = P - K[1.8T + 32] in which Q is runoff, P is annual rain fall in cm, T is mean annual temperature in centigrades and K is a constant, is known
Options
A. Justin's formula
B. Khosla's formula
C. English formula
D. Vermule's formula.
Correct Answer
Khosla's formula
More questions
1. The quantity of stone ballast required per metre tangent length, is
6. The time for a clay layer to achieve 90% consolidation is 15 years. The time required to achieve 90% consolidation; if the layer were twice as thick, 3 times forr permeable and 4 times more compressible would be :
8. The process of manufacturing steel by heating short lengths of wrought iron bars mixed with charcoal in fire clay crucibles and collecting the molten iron into moulds, is known as