CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Supply Engineering
Comments
Question
Standard process of chlorination of water, is done by
Options
A. plain chlorination
B. pre-chlorination
C. post-chlorination
D. double chlorination.
Correct Answer
post-chlorination
Water Supply Engineering problems
Search Results
1. The permissible pH value for public water supplies may range between
Options
A. 4.5 to 5.5
B. 5.5 to 6.5
C. 6.5 to 8.5
D. 8.5 to 10.5
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 6.5 to 8.5
2. The maximum permitted loss of head in a rapid sand filter, is
Options
A. 1 m
B. 2 m
C. 3 m
D. 4 m
E. 5 m.
Show Answer
Scratch Pad
Discuss
Correct Answer: 3 m
3. The cast iron pipes for water supply system are used for
Options
A. durability
B. strength
C. easy connection
D. low maintenance cost
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
4. For centrifugal pumps
Options
A. initial cost is low
B. limited space is required
C. the discharge obtained is steady and non-pulsating
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. Turbidity of water may be caused due to
Options
A. Suspended clay
B. Suspended silt
C. finely divided organic material
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. For maximum alkalinity of water, pH value should be
Options
A. zero
B. less than 7
C. more than 7
D. 14
E. 21
Show Answer
Scratch Pad
Discuss
Correct Answer: 14
7. The strainer type tube well, is unsuitable for
Options
A. coarse gravels
B. fine sandy strata
C. clean gravels
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: fine sandy strata
8. The four major water supply distribution systems, are
Options
A. dead end, tree, grid iron and reticulation
B. dead end, tree, grid iron and circular
C. tree, grid iron, ring and radial
D. tree, reticulation, circular and ring.
Show Answer
Scratch Pad
Discuss
Correct Answer: tree, grid iron, ring and radial
9. Critical time for developing a water hammer, is the time required for
Options
A. closing the valve
B. the wave to travel from valve to the reservoir
C. the wave to travel from the valve to the reservoir and back
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: the wave to travel from the valve to the reservoir and back
10. Maximum threshold number permitted for indicating the odour of public water supplies, is
Options
A. 1
B. 2
C. 3
D. 4
E. 5
Show Answer
Scratch Pad
Discuss
Correct Answer: 3
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering