CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Water Supply Engineering
Comments
Question
Sluice valves are fitted in a distribution system
Options
A. along straight length of pipes at suitable intervals
B. at the junctions of the pipes
C. at the branching off points of sub-mains
D. all the above.
Correct Answer
all the above.
Water Supply Engineering problems
Search Results
1. To detect the turbidity of the order of 0 to 1000 P.P.M. the instrument used is
Options
A. turbidimeter
B. Jackson turbidimeter
C. Baylis turbidimeter
D. Hallige turbidimeter.
Show Answer
Scratch Pad
Discuss
Correct Answer: Baylis turbidimeter
2. The period of cleaning of a slow sand filter, is usually
Options
A. 5 to 10 days
B. two weeks to three weeks
C. one month to three months
D. three months to six months
E. one year.
Show Answer
Scratch Pad
Discuss
Correct Answer: one month to three months
3. Flow through period, in sedimentation tanks, is
Options
A. equal to detention period
B. more than detention period
C. less than detention period
D. detention period divided by displacement efficiency
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: less than detention period
4. Increase in population of a rapidly growing city, may be estimated by
Options
A. arithmetical mean method
B. geometrical method
C. incremental increase method
D. graphical comparison method.
Show Answer
Scratch Pad
Discuss
Correct Answer: geometrical method
5. A city supply includes
Options
A. domestic water demand
B. industrial and commercial water demands
C. demand for public uses and fire
D. water losses
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. The lowest outlet sluice in a dam is provided
Options
A. below the dead storage
B. on the top level of dead storage
C. on the top level of useful storage
D. at the centre of the dam.
Show Answer
Scratch Pad
Discuss
Correct Answer: on the top level of dead storage
7. Mud balls may be removed by
Options
A. breaking and washing
B. washing the filter with a solution of caustic soda
C. removing, cleaning and replacing the damaged sand
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. Pick up the correct statement from the following :
Options
A. Lime may be used to soften the hard water
B. Excessive use of lime may kill the bacterias
C. Excessive lime when added to water, raises its pH value
D. When lime raises pH value of water to about 9.5, 100% bacterias are removed
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
9. For estimating the run off of catchments, the mean value of the constant '
K
' in the Khosla's formula
Q
y
=
P
y
-
K
(1.8
T
y
+ 32) is
Options
A. 1.21
B. 1.23
C. 1.25
D. 1.27
E. 1.31
Show Answer
Scratch Pad
Discuss
Correct Answer: 1.27
10. The bacterias which require free oxygen for their survival, are called
Options
A. Aerobic bacterias
B. Anaerobic bacterias
C. Faculative bacteria
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Aerobic bacterias
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering