CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Advanced Surveying
Comments
Question
Pick up the correct statement from the following :
Options
A. If the applied tension to the tape is more than the standard, the tension correction is positive
B. If the applied tension to the tape is less than the standard, the tension correction is negative
C. If the temperature during measurement is greater than the standard temperature, the temperature correction is positive
D. If the temperature during measurement is lower than the standard temperature, temperature correction is negative
E. All the above.
Correct Answer
All the above.
Advanced Surveying problems
Search Results
1. The principal line is the line joining the principal point and
Options
A. nadir
B. isocentre
C. perspective centre
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: isocentre
2. The time interval between successive transits of the moon, is
Options
A. 24 hours 10 minutes
B. 20 hours 25 minutes
C. 24 hours 50 minutes
D. 23 hours 50 minutes
E. 23 hours 25 minutes.
Show Answer
Scratch Pad
Discuss
Correct Answer: 24 hours 50 minutes
3. At the first point of Aeries, the sun moves
Options
A. northward
B. southward
C. from south to north of the equator
D. from north to south of the equator.
Show Answer
Scratch Pad
Discuss
Correct Answer: from south to north of the equator
4. If a star whose declination is 60° N culminates at zenith, its altitude at the lower culmination, is
Options
A. 10°
B. 20°
C. 30°
D. 40°
E. 60°.
Show Answer
Scratch Pad
Discuss
Correct Answer: 30°
5. The distance between the projection centre and the photograph, is called
Options
A. principal distance
B. principal line
C. isocentric distance
D. focal length.
Show Answer
Scratch Pad
Discuss
Correct Answer: principal distance
6. In observations of equal precision, the most probable values of the observed quantities are those that render the sum of the squares of the residual errors a minimum, is the fundamental principle of
Options
A. Gauss' Mid Latitude formula
B. Delamber's method
C. Legendr's method
D. Least square method.
Show Answer
Scratch Pad
Discuss
Correct Answer: Least square method.
7. If the distance between the projectors is altered by a movement along
X
-axis of one projector,
Options
A. the length of the air base is increased
B. the scale of the model is altered
C.
y
-parallax is not affected
D. relative orientation is not affected
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
8. The declination and right ascension of the sun becomes 23° 27' N and 90° respectively on
Options
A. March 21
B. June 21
C. September 21
D. December 22.
Show Answer
Scratch Pad
Discuss
Correct Answer: June 21
9. Stellar astronomy deals with
Options
A. plane surveying
B. geodetic surveying
C. star observations
D. planet observations.
Show Answer
Scratch Pad
Discuss
Correct Answer: star observations
10. Pick up the incorrect statement from the following. The angular distance of hevenly bodies on observer's meridian measured from the pole, is
Options
A. co-declination
B. co-altitude
C. co-latitude
D. polar distance
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: co-declination
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering