CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Concrete Technology
Comments
Question
Pick up the incorrect statement from the following:
Options
A. Workability of the concrete mix decreases with an increase in the moisture content
B. Concrete for which preliminary tests are conducted, is called controlled concrete
C. Bulking of sand depends upon the fineness of grains
D. Concrete mix 1 : 6 : 12, is used for mass concrete in piers.
E. All the above.
Correct Answer
All the above.
Concrete Technology problems
Search Results
1. The bulk density of aggregates, depends upon
Options
A. shape
B. grading
C. compaction
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. 1.S.I. has specified the full strength of concrete after
Options
A. 7 days
B. 14 days
C. 21 days
D. 28 days
E. 35 days
Show Answer
Scratch Pad
Discuss
Correct Answer: 28 days
3. Particles of 0.002 mm size are that of
Options
A. clay
B. sand
C. gravel
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: clay
4. For given workability the grading requiring the least amount of water is one that gives
Options
A. greatest surface area for the given cement and aggregates
B. least surface area for the given cement and aggregates
C. least weight for the given cement and aggregates
D. greatest weight for the given cement and aggregates
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: greatest surface area for the given cement and aggregates
5. The main object of compaction of concrete, is:
Options
A. to eliminate air holes
B. to achieve maximum density
C. to provide initimate contact between the concrete and embedded materials
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
6. The size of fine aggregates does not exceed
Options
A. 2.75 mm
B. 3.00 mm
C. 3.75 mm
D. 4.75 mm
E. 5.75 mm
Show Answer
Scratch Pad
Discuss
Correct Answer: 4.75 mm
7. Bulking of sand is
Options
A. mixing of different sizes of sand particles
B. mixing of lime with sand
C. maximum water with sand
D. swelling of sand when wetted.
Show Answer
Scratch Pad
Discuss
Correct Answer: swelling of sand when wetted.
8. The maximum percentage of chemical ingredient of cement is that of
Options
A. magnesium oxide
B. iron oxide
C. aluminium
D. lime
E. silica.
Show Answer
Scratch Pad
Discuss
Correct Answer: lime
9. Longitude of a place is the angular distance between the meridian of the place and
Options
A. the standard meridian
B. the international date line
C. that of Greenwich
D. both (a) and (c) of above.
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (c) of above.
10. A nautical mile is
Options
A. one minute arc of the great circle passing through two points
B. one minute arc of the longitude
C. 6080 ft
D. 1855.109 m
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering