CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Concrete Technology
Comments
Question
The produce impermeable concrete
Options
A. thorough mixing of concrete is required
B. proper compaction of concrete is required
C. proper curing of concrete is required
D. properly graded and non-porous aggregates are requied
E. all the above.
Correct Answer
all the above.
Concrete Technology problems
Search Results
1. The final operation of finishing floors, is known as
Options
A. screeding
B. floating
C. trowelling
D. finishing
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: trowelling
2. Segregation is responsible for
Options
A. honey-combed concrete
B. porous layers in concrete
C. surface scaling in concrete
D. sand streaks in concrete
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. The grade of concrete not recommended by I.S. : 456, is
Options
A. M 100
B. M 200
C. M 300
D. M 400
E. M 500
Show Answer
Scratch Pad
Discuss
Correct Answer: M 500
4. For construction of structures in sea water, the cement generally preferred to, is
Options
A. Portland-pozzolana cement
B. quick setting cement
C. low heat Portland cement
D. rapid hardening cement
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Portland-pozzolana cement
5. Addition of pozzolana to cement
Options
A. decreases workability
B. increases strength
C. increases heat of hydration
D. decreases curing time
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
6. According to the recommendations of IS : 456-1978, the expansion joints
Options
A. are provided where plane changes abruptly
B. are provided to ensure minimum resistance
C. are supported on separate columns
D. do not carry reinforcement across them
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
7. The datum temperature for maturity by Plowman, is
Options
A. 23°C
B. 0°
C. - 5.6°C
D. - 11.7°C
Show Answer
Scratch Pad
Discuss
Correct Answer: - 11.7°C
8. For an ordinary Portland cement
Options
A. residual does not exceed 10% when sieved through IS Sieve No. 9
B. soundness varies from 5 to 10 mm
C. initial setting time is not less than 30 minutes
D. compressive stress after 7 days, is not less than 175 kg/cm
2
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: initial setting time is not less than 30 minutes
9. Workability of concrete for a given water content is good if the aggregates, are
Options
A. rounded aggregate
B. irregular aggregate
C. angular aggregate
D. flaky aggregates.
Show Answer
Scratch Pad
Discuss
Correct Answer: rounded aggregate
10. 1.S. Sieve Nos. 10 mm and 4.75 mm are geneally used for grading of
Options
A. coarse aggregates
B. fine aggregates
C. neither (a) nor (b)
D. both (a) and (b)
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: both (a) and (b)
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering